Project Designation:

Auto repair shop, showroom, and offices for UMI in Hadera.
The plan included renovation works for the existing building and erecting a new building with an area of about 2,000 square meters. As part of the project, frame works with steel roof were carried out, as well as electric systems, plumbing, air conditioning, as well as exterior development and landscaping. The project also included stone-cladding, sheet-metal cladding, aluminum windows, and finishing works for the different needs of offices, auto repair shop, and nearby car showroom.

Developer: Universal Motors Israel Ltd.
Architecture: Kasif, Levitsky, Bareli.
Management and Supervision: S.A.D.G Engineering and Construction Ltd.
Structural Engineer: Horowitz, Buch, Dickman.